Jump to content

CRT Discharge Procedure: Revision history

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 September 2026

  • curprev 02:1502:15, 23 September 2026 Josh talk contribs 14,057 bytes −45 Remove self-referential wording per house rule undo
  • curprev 02:0502:05, 23 September 2026 Josh talk contribs 14,102 bytes +11,126 Rewrite against Apple Service Guide 1990 and Goldwasser CRT notes: corrected earth-return point (ground lug, never logic board), added never-wear-a-wrist-strap rule and implosion/goggles hazard, replaced unsourced 25 kV blanket with sourced per-class figures, replaced dead-short tool with resistive tooling, removed invented 30-min wait / 10-s hold / 10-15-min re-discharge interval, added ongoing shorting lead and aquadag mechanism; full ref citations undo

25 May 2025

4 April 2025