Jump to content

Sega Master System II General Maintenance

From RetroTechCollection
Revision as of 08:57, 12 May 2025 by Josh (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Sega Master System II Motherboard

The Sega Master System II is a compact 8-bit home console released in 1990. This guide covers every recommended step to keep your SMS II running reliably for decades: mechanical care, electrical inspections, contact cleaning, capacitor health, and environmental best practices.

[edit | edit source]
  • Soldering: 60 W temperature-controlled iron with conical tip; desolder braid & pump
  • Measurement: ESR meter; digital multimeter
  • Cleaning: Isopropyl alcohol (≥ 90 %), DeoxIT D5 contact cleaner, compressed air, soft nylon brush, lint-free swabs
  • Mechanical: Nylon spudgers, plastic pry tools, light machine oil (e.g. Tri-Flow), cotton swabs
  • Replacement Parts: 105 °C low-ESR electrolytic capacitors (Nichicon FR/Panasonic FC/Rubycon ZLJ), 2.1×5.5 mm PCB-mount power jack, plastic-safe grease

Safety Precautions

[edit | edit source]
  1. Always unplug the console and peripherals.
  2. Discharge static by touching a grounded metal surface; use an ESD wrist-strap when handling PCBs.
  3. Work in a well-ventilated area away from flammable materials.
  4. Let soldering iron heat fully before use; avoid prolonged heating on PCBs.

Disassembly Procedure

[edit | edit source]
  1. Place console top-side down; remove six Phillips screws (4 in corners, 2 under cartridge tray).
  2. Pry apart top and bottom shells at rear vent clips using a nylon spudger.
  3. Lift out the cartridge tray assembly—no cables attached.
  4. Unscrew the two RF-shield screws; hinge the shield upward and remove.
  5. Slide the logic board forward to disengage front edge; lift straight out, noting AV-port cable orientation if fitted.

Exterior & Mechanical Cleaning

[edit | edit source]

Shell & Vents

[edit | edit source]
  • Wipe shell halves with a mild detergent solution; rinse and air-dry.
  • Blow out dust from ventilation slots using low-pressure compressed air.

Cartridge Tray Mechanism

[edit | edit source]
  • Inspect the metal push-lock rails and springs. Lightly lubricate sliding surfaces with a plastic-safe grease.
  • Clean the tray surfaces and spring contacts with isopropyl alcohol to remove grime.

Buttons & Ports

[edit | edit source]
  • Controller ports: spray contact cleaner into each port; plug/unplug a controller several times.
  • AV-out DIN connector: clean pins with DeoxIT on a swab; avoid bending fragile contacts.
  • Power-jack socket: inspect for looseness; clean inner barrel with a cotton swab moistened in alcohol.

Internal Electrical Maintenance

[edit | edit source]

Visual Inspection

[edit | edit source]
  • Look for bulging or leaky electrolytic capacitors on the logic board—especially C1–C4.
  • Inspect solder joints around power-jack, edge connector, RF shield posts, and VDP/PSG ICs for cracks or “white” oxidation.

Capacitor Health & Replacement

[edit | edit source]
SMS II Electrolytic Capacitors
Ref Value Voltage Purpose
C1 100 µF 16 V Z80 clock decouple
C2 47 µF 16 V +5 V core rail smoothing
C3 10 µF 16 V SN76489 PSG decouple
C4 4.7 µF 10 V Audio output filter
  • Measure ESR for each cap; if > 1 Ω, install 105 °C, low-ESR replacements.
  • Desolder old parts cleanly, avoid pad lifting; scrub flux residue with IPA.

Power-Jack Replacement

[edit | edit source]
  • If the external DC jack is loose or intermittent, desolder its three PCB pins and install a new 2.1×5.5 mm centre-positive jack.
  • Verify correct polarity and secure orientation before soldering.

Connector & Edge-Card Care

[edit | edit source]
  • Cartridge slot: apply DeoxIT to the edge connector; insert a donor PCB rom-edge, move in/out to polish contacts.
  • Test continuity between each pin of the slot and its corresponding IC to ensure no open circuits.

Solder Joint Reflow

[edit | edit source]
  • Reflow any suspicious joints on the RF-shield grounding posts and the multi-layer cartridge connector.
  • Use a small amount of fresh lead-bearing solder to strengthen aged joints.

Thermal & Ventilation Considerations

[edit | edit source]
  • Although the Z80 and VDP run cool, ensure vents remain unobstructed to prevent heat buildup.
  • Avoid storing the console in enclosed or unventilated cabinets.
  • If operating in a warm environment (> 30 °C), provide additional airflow (small USB fan).

Routine Maintenance Schedule

[edit | edit source]
Recommended Maintenance Interval
Interval Tasks
Every 6 months Dust out vents; clean cartridge and controller ports.
Every 2 years Inspect & clean inside; check caps ESR; reflow key joints.
Every 5 years Replace electrolytic capacitors; replace power jack if needed.
As required Lubricate tray rails; reseat ICs; clean A/V connector.

Environmental & Storage Best Practices

[edit | edit source]
  • Store in a cool, dry location (15 – 25 °C; < 50 % humidity).
  • Keep cartridges and console covered to minimize dust ingress.
  • Use silica gel packs in storage containers to control moisture.
  • Remove power adapter when not in use to avoid creeping voltage stress.

Further Reading & Resources

[edit | edit source]